Proven results at scale

Measured energy reduction and rapid return on investment across commercial environments.

Trusted by leading organisations on their journey to net zero.

Built for the 2012 Olympic Games
London Stadium.jpg__PID:2a7c0e2c-1d11-4303-a3c4-1faeaadbba9b

"All work was completed to a high standard and quality of finish. The installation team were reliable and met all required deadlines."

Stanley Ingram

Project Manager

London Stadium

Energy reduction inside one of the UK's most iconic venues

Lightwave was deployed across hospitality refrigeration and small power equipment throughout London Stadium, the venue originally built for the 2012 Olympic Games.

By introducing device-level energy control, the stadium was able to significantly reduce unnecessary runtime across drinks fridges and hospitality equipment while maintaining operational performance during events.

66%

Reduction in targeted energy consumption

Less than 12 months

Typical return on investment

Zero disruption

To stadium operations

Understand your energy savings potential

Book a consultation to see where energy is being wasted and how quickly savings could be achieved.

Book energy consultation